ATTENTION — TESTING IN PROGRESS · Currently testing by MPD Megavisor and Oilfield Legend Butterwix
AIMPD ENGINEER

New job

Drop survey Excel (required), type MD and the well below. Model calculates TVD. Confirm, then run.

How to use this

Drop a Survey Excel first. Type MD values on the form — the model calculates TVD from survey stations (MD + INC). Never type TVD.

  • Survey (required) — Excel only (.xlsx / .xls; csv OK). Not PDF. MD + INC required (AZI optional). TVD is calculated from the survey — do not type it.

Everything else is typed on the form — mud, BHA, casing, window, procedure. No other file drops on this page.

Before you run

Check every number. Confirm yellow cells from the survey, then run. Re-read stays available when a survey draft is on file. Run is blocked without a survey.

Survey

Drop survey data to continue (Excel)

Type the well

Survey Excel is required above. Rig → Operator → Well, then MD — never type TVD. Yellow cells need a check before Confirm.

Well
Pick a known rig or New… — jobs for this rig are shared.
Type the operator. Saved under this rig.
Type the well. Saved under this rig.
Hole / TD measured depth. Open hole goes from the deepest shoe down to here.
Hole
How many casing strings you’ve got. Open hole fills in from the deepest shoe to hole depth.
Open-hole ID. Not casing ID. Blank until you type it.

Casing 1 — from MD, to MD, and ID.

Open hole is automatic: deepest casing shoe → Hole depth (MD) above. ID = bit size. Nothing to type.

String
When on, hide the BHA and drill-pipe section tables — string is one DP OD/ID for full depth (quick path). Default off so you build BHA + DP sections.
First line is always the bit. Then motor, collars, HWDP, etc.

Bit — first line is always the bit. OD often matches hole/bit size; hole ID still comes from Bit size above.

BHA cumulative: ft

Drill pipe (above BHA toward surface)

DP always runs from the top of the BHA to surface. For 2+ sections, list bit-side first, then toward surface; lengths split different OD/ID sections. Default 1 for simple wells.

DP 1 — bit-side first (just above BHA), then toward surface.

DP cumulative: ft DP still extends to surface. For one section, leave length blank and the engine uses MD at bit − BHA cumulative; with 2+ sections, lengths split the string by OD/ID.

bbl per stroke.
Same as your drilling pump rate. Circulate plans won’t go above this.
Mud
Type this yourself — the survey does not supply it.
Type this yourself — the survey does not supply it. Slug means a dry trip. Barrels are sized after Run model — override on Review if needed.
Window
Floor EMW target / setpoint.
FIT / max ECD ceiling.
Subtracted from FIT for usable ceiling. Blank = 0.
One number. Default 1000 psi.
Trip
Dry or wet Slug means a dry trip. Wet trip — no slug. Type slug MW when dry.
Slug-in-kill? Yes = slug MW part of kill column. No = pump slug out; annulus KWM only.
From survey: shallowest MD where INC ≥ 90°. Yellow = draft — override if needed. Blank without survey. Never type TVD.